Independence Demolition faced structural challenges in demolishing the 17-story former Omni International Hotel to make way for a new conference facility and underground parking.

Structural House of Cards Threatens Pedestrian Bridge

Wrecking the hotel with a conventional crane and wrecking ball would potentially endanger a three-story glass-enclosed 20-foot-long pedestrian bridge located just 30 feet away from the building. The hotel structure was comprised of seven-inch-thick post-tensioned concrete slabs spanning 75 to 100 feet over eight-inch-thick lightly reinforced shear walls spaced at 26 feet to a central 26-foot-wide elevator and stairwell. After stripping away the brick, aluminum and glass facade, the structure would progressively collapse floor by floor like a house of cards and threaten the Cleveland Clinic employees and patients who use the pedestrian bridge below.

Collaboration is the Solution

To safeguard the pedestrian bridge, Independence worked closely together with the subcontractors on site including Precision Environmental, Safway Steel, Waco Scaffolding and Equipment, and Leinweber and Associates.

Structural analysis by Don Leinweber revealed that the structure could be systematically demolished by reshoring four floors at a time and using bobcat mounted hammers to reduce the floors and walls to rubble that would be transported to the ground through the elevator shafts. Each subcontractor then focused on one step of the demolition and coordinated their efforts with the entire group. Waco did the reshoring, Safway handled scaffold erection at the entire north face, and Precision Environmental was responsible for complete architectural demolition of the building interior and curtain wall.

Client

Morse Diesel International

Date

Spring 2000

Location

Cleveland, Ohio

Summary

Demolishing a 17-story hotel to make way for a new conference facility and underground parking.